Mona Vale East

Project Overview

Client: Transport for New South Wales
Length: 3.2 km’s
Duration: January 2019 to March 2024
Value: $160 million
Contract type: GC21

Works undertaken

The Mona Vale Road East upgrade project addresses congestion and improves traffic flow by widening the road from two lanes to four between Lane Cove Road (Ingleside) and Foley Street (Mona Vale). The steep grade and lack of overtaking lanes previously led to long travel times, especially during peak hours.


Key features:

• An additional lane in both directions

• Widened shoulders for cyclists and pedestrians, along with dedicated shared paths

• Bus priority measures to enhance public transport efficiency

• A truck arrestor bed for added safety on steep grades

• Replacement of the roundabout at Ponderosa Parade with a signalised intersection

• Construction of retaining walls up to six meters high and cuttings through sandstone up to sixteen meters high

• Fauna connectivity measures to protect wildlife

Ausling provided two surveillance officers to audit and monitor the project’s progress

These upgrades are designed to improve safety, reduce travel times, and provide better infrastructure for pedestrians, cyclists, and public transport users.

Click to enlarge images.

Tara Davy

THE FACTS.

I have loved every. single day. of my 15 year career in design so far. It’s true love!

My experience covers magazine publishing, branding, web design, packaging and social content creation.

University qualified (B.Des).

Beach and coffee loving Aussie.

I love people and I love brands, so let’s work together.

https://www.ratherdesign.com
Previous
Previous

TfNSW Maritime

Next
Next

Eden Safe Harbour