TfNSW Maritime

Project Overview

Client: Transport for New South Wales (Maritime Infrastructure Delivery Office)
Assets: 122 Wharves with estimated value over $1 billion
Duration: July 2023 to December 2025
Value: $25 million annually 

Works to be undertaken

Transport for NSW (TfNSW) manages and maintains 122 wharves and other maritime structures on Sydney Harbor including the Parramatta and Lane Cove Rivers, as well as a few regional locations in NSW. Maintenance Services are delivered though maintenance contractors to meet the needs of the public, service providers and various commercial operators. The program aims to maintain TfNSW assets to ensure safe, reliable, and resilient service delivery while representing best value over the asset life cycle.

Ausling has played a key role over the last 18-months with their team providing onsite management, engineering, and surveillance support.

Key elements of the works include:

Procurement of engineering and design services

  • Management of consultants

  • Asset handover

  • Investigations, structural analysis, and development of repair details

  • Major substructure and concrete soffit repairs at Circular Quay promenade 

  • Timber substructure and deck repairs at Manly Wharfs

  • Timber substructure and concrete deck replacement at Campbells Cove Jetty

  • Replacement of fender systems for various ferry wharfs

  • Replacement of cathodic protection systems across all assets

  • Design fabrication and replacement of aluminium gangways at various wharves

  • Marine piling

  • Seawall repairs

  • Routine maintenance

  • Essential services testing and maintenance

  • Comprehensive condition assessments in accordance with (WSCAM 2022)

  • Prioritisation of maintenance works based on condition assessments

  • Stakeholder engagement

Ausling’s Project Manager is currently providing on-site support to the Maritime Wharf Maintenance team to deliver maintenance works and provided previous support in the form of a Contracts Manager and Surveillance Officer to assist with development of systems and processes to aid in maintenance delivery whilst mitigating impacts to service delivery. 

Tara Davy

THE FACTS.

I have loved every. single day. of my 15 year career in design so far. It’s true love!

My experience covers magazine publishing, branding, web design, packaging and social content creation.

University qualified (B.Des).

Beach and coffee loving Aussie.

I love people and I love brands, so let’s work together.

https://www.ratherdesign.com
Previous
Previous

Singleton Bypass

Next
Next

Mona Vale East