Ocean Drive Duplication
Ausling is managing the Ocean Drive Upgrade project under a GC21 contract, focusing on enhancing a 3.4-kilometre stretch of road between Greenmeadows Drive and Matthew Flinders Drive.
M1 Pacific Motorway Extension to Raymond Terrace
Ausling is assisting with the Independent Certification for the motorway extension from M1 to Raymond Terrace. This 15-kilometre dual carriageway includes interchanges at Black Hill, Tarro, Tomago, and Raymond Terrace, and a 2.6-kilometre bridge.
Kempsey to Armidale Road Restoration
Ausling is providing expertise in engineering, commercial, and community management for the Kempsey-Armidale Road project, a major recovery and rehabilitation effort.
Singleton Bypass
Watch the video. Ausling is providing engineering expertise for the Singleton Bypass project, which includes constructing an 8-kilometre highway with a single lane in each direction.
TfNSW Maritime
Maintenance services are delivered through maintenance contractors to meet the needs of the public, service providers and various commercial operators.
Mona Vale East
Ausling assisted TfNSW with onsite management and site surveillance for the Mona Vale Road East upgrade.
Eden Safe Harbour
The Eden Safe Harbour Project’s primary goal was to create a safer environment for both local and visiting vessels, while also enhancing the protection of existing maritime infrastructure in Snug Cove.
New Gunnedah Bridge
Ausling managed project and commercial aspects and while onsite WHS, Environmental and Quality surveillance was undertaken for the Gunnedah Bridge project.
Bolivia Hill Upgrade
Ausling undertook project and contract management, onsite surveillance, and auditing for the Bolivia Hill project, which addressed critical safety concerns by enhancing road alignment to reduce crash rates.
New Tabulam Bridge
The Bruxner Highway Bridge over the Clarence River at Tabulam is a state heritage-listed structure with a total length of approximately 300 meters.
Sydney Airport
Ausling undertook site management, WHS, Environmental and Quality surveillance for major infrastructure upgrades in the Sydney Airport precinct, enhancing road connectivity, drainage, and pedestrian/cyclist access.
Guanna Hill Upgrade
The Mitchell Highway realignment project at Guanna Hill, located 21 kilometres north of Orange, involved a significant upgrade to improve road safety and efficiency.
The Northern Road 2 & Bringelly Road Upgrade
Ausling worked with TfNSW team providing onsite surveillance for The Northern Road upgrade, a major infrastructure project spanning 11.3 kilometres from Peter Brock Drive in Oran Park to Mersey Road in Bringelly.
Warrell Creek to Nambucca Heads Pacific Highway Upgrade
Ausling undertook project, contract and construction management as well as WHS, Environment and Quality surveillance for the Warrell Creek to Nambucca Heads highway upgrade, a 20-kilometre project designed to enhance connectivity and safety.
Halfway Creek to Glenugie Pacific Highway Upgrade
Ausling provided engineering and project management services for the upgrade between Grays and Franklin Roads, transforming the existing two-lane highway into a multi-lane, median-separated, concrete-paved roadway.
Oxley Highway to Kundabung Pacific Highway Upgrade
The Pacific Highway upgrade is a significant infrastructure development aimed at improving safety and traffic flow. Spanning 23 kilometres from just north of Port Macquarie to south of Kundabung.
Nambucca Heads to Urunga Pacific Highway Upgrade
Ausling provided project management, surveillance, and client management services, overseeing the Nambucca to Urunga highway project, which involved constructing 22 kilometres of four-lane divided road to Class-M (motorway) standards.
Sapphire to Woolgoolga Pacific Highway Upgrade
Ausling undertook project management, surveillance and client management services for the project. The 25km multi-lane, median-separated highway with five grade-separated interchanges, 28 bridge structures and 15 kilometres of local road enhancements was a challenging project for the team.